Archive for April, 2021

Amtrak Anniversary Saturday: The Greatest Travel Advance Since the 747

April 30, 2021

Over the course of five decades, Amtrak has written a lot of chapters in its history, some of which largely have been forgotten or were never widely known.

One of those is illustrated in the photograph above made in Joliet, Illinois, in 1974 by Robert Farkas.

In Amtrak’s early years it was limited as to what it could do to improve intercity rail passenger service.

It could tinker with schedules somewhat, but much of its fate was in the hands of its contract railroads, which employed the operating and onboard personnel associated with the trains. In essence the freight railroads ran the trains and sent Amtrak the bill.

One opportunity to show that Amtrak was doing something to “make the trains worth traveling again” as the marketing slogan went, came in late 1972.

The French company ANF-Frangeco was building 16 sets of turbine-powered trains for the French National Railways.

The latter agreed to lease to Amtrak sets 9 and 10 with an option to buy.

The first Turboliner arrived in Chicago on Aug. 11, 1973. The red, white and blue train was billed by Amtrak in more than a bit of hyperbole as being perhaps the greatest advance in travel since the 747.

An Amtrak advertisement described the Turboliner as “the jet train that glides down the track . . . so smoothly you can hardly feel the rails.”

The Turboliner made a publicity run between Chicago and Bloomington, Illinois, on a rainy Sept. 28, 1973, piloted by Wilton V. Hall, whose father had been the engineer of the first diesel-powered train from Chicago to Bloomington, Illinois, on the Alton Route in the 1930s.

Revenue service for Amtrak’s Turboliners between Chicago and St. Louis began on Oct. 1.

That month the Chicago Tribune sent three reporters on a “race” from Tribune Tower to the Chase Park Plaza Hotel in St. Louis.

One reporter flew out of Midway Airport and went the distance in three hours, 15 minutes. A second reporter rented a car and drove to St. Louis, arriving at the hotel in five hours, 20 minutes.

The third reporter took Amtrak. He was delayed leaving Union Station by eight minutes and his train stopped in a siding three times. He arrived at the hotel in six hours, 14 minutes.

The Turboliners received a lot of attention, but also displeased many because of their narrow seats that reclined very little, narrow aisles, and doors that could be difficult to open.

With a fixed consist, some passengers had to stand on days when more people boarded than there were seats and some passengers were turned away.

Capable traveling 125 miles per hour, the top speed on the now Illinois Central Gulf route was 79 p.m., although the Turboliner running time was a half-hour faster than convention equipment on the Chicago-St. Louis route.

The Federal Railroad Administration rejected Amtrak’s bid to operate the Turboliners at 90 mph because of their superior braking ability.

In its decision the FRA said the route lacked an automatic train stop or cab signal system. At the time the FRA made its ruling, a series of grade crossing collisions involving Turboliners had received widespread news media attention even though no one had been killed or seriously hurt in any of those incidents.

Amtrak ordered additional Turboliners and placed them in service in the Chicago-Detroit corridor in April 1975. Unlike the Turboliners used on the St. Louis run, the Michigan Turboliners had drop down tables and more luxurious reclining seats.

The Turboliners were credited with driving an immediate sharp increase in ridership on the Detroit route.

Amtrak President Paul Reistrup would testify at a congressional hearing that Amtrak was fortunate to be able to buy something off the shelf that was flashy, had large windows, and looked like it was going a million miles an hour when in reality it was actually doing 60 on well-worn Penn Central rails.

As occurred on the St. Louis route, the fixed capacity of the Turboliners of slightly less than 300 led to standees on busy travel days.

On the St. Louis route, the Turboliners were replaced for a time with conventional equipment and then Amfleet cars when those became available in late 1975. A similar process played out on the Detroit line although Turboliners continued on some Michigan trains into the early 1980s.

The Chicago-Toledo Lake Cities, which operated via Detroit, had Turboliner equipment in its early days, making it the only Amtrak train in Ohio to ever be turbine powered.

Turboliners also lasted in the Midwest on the Chicago-Milwaukee route into the 1980s. Another generation of turbine trains, built in California under license saw service on the Empire Corridor for several years and would be Amtrak’s last turbine powered trains.

While living in Springfield, Illinois, in the middle 1970s, I often saw and a few times rode the Turboliners. They were nice, but I preferred Amfleet coaches after they came along.

I even rode the Lake Cities when it still had Turboliners and rode on the Milwaukee line once in a Turboliner in 1980, my last time aboard one.

They rode fine, but I could always feel the rails. Nor did they glide down the track as the advertisement claimed. As for the interiors, I liked those large windows. The cafe section, though, was way too small.

I still remember radio jingles for the Turboliner when they went into service with a chorus singing the line, “hitch a ride on the future (pause) with Amtrak.”

The Turboliner may not have lived up to its billing as a high-speed conveyance but it did for a time enable Amtrak to achieve the objective of offering something new that promoted the appearance of the passenger carrier doing something to improve intercity rail travel after years of neglect, benign or intentional.

Turboliners were not Amtrak’s future but a transition step toward the Amfleet era, which is still very much with us today more than 45 years after it began.

Article by Craig Sanders, Photograph by Robert Farkas

Amtrak Anniversary Saturday: Where Were You and What Were You doing May 1, 1971?

April 30, 2021

Where were you on May 1, 1971? Did you do anything to observe, document or celebrate the transition between freight railroad operation of intercity passenger trains and Amtrak operation?

Maybe you were too young to remember or to have been aware of the day that Amtrak began. Or maybe you had yet to be born.

I was a senior in high school on the day Amtrak started. It was a Saturday just as the 50th anniversary this year is falling on a Saturday.

At the time I was living in Mattoon, Illinois, which would be a stop for Amtrak trains operated between Chicago and New Orleans, and Chicago and Carbondale, Illinois.

I recall seeing from my backyard the first New Orleans-bound Amtrak train from Chicago.

I was disappointed that it looked exactly like the Illinois Central City of New Orleans of the day before with locomotives and passenger cars wearing IC chocolate brown and orange with yellow striping.

Like all teenagers I was naïve about how the world worked. I had read in newspapers about this new Amtrak operation that was to begin on May 1.

Yet I was expecting the trains to look quite different than they had. In fact, it would be more than a year before I saw a passenger car or locomotive that had been repainted into Amtrak’s livery.

Aside from seeing the first Chicago to New Orleans Amtrak train I also saw the last IC passenger train to complete its final journey.

The last northbound City of New Miami had left its namesake city on April 30. Trains that left that day were to continue to their terminus.

Therefore, the last pre-Amtrak train to finish its trip that was not slated to be part of Amtrak would not halt for the final time until May 2.

The City of Miami would not be joining Amtrak. Instead, it passed through Mattoon around 3 p.m. just as it had for many years and rolled into history. The number of trains making their final runs was a major focus of news coverage of the coming of Amtrak.

Sometime that summer cars from other railroads began showing up in the consists of the Amtrak trains that served Mattoon.

It had always been a thrill for me to see whenever I could passenger cars from other railroads. It wasn’t something I got to see often.

That June, I began college although I wouldn’t begin living on campus until late August.

I sometimes saw Amtrak trains during my trips home and during school breaks and made mental notes as to how they had changed or not changed.

My first opportunity to ride an Amtrak train did not come until late 1972.

In looking back I recall having had a sense of something historic occurring but I’m not sure I realized the gravity of it.

I wish now I could have done more – far more, actually – to have experienced and documented those historic days.

But I didn’t have a camera, didn’t have much money, and didn’t have anyone who could have taken me to ride and/or photograph trains in their final hours.

Besides, I was in school and the only time I might have been able to do that would have been on weekends.

So I just followed what was happening by reading about it in the newspapers. I did, by the way, save some of those newspaper stories from April 30 and May 1.

Fifty years later I’ve ridden most Amtrak routes at least once and made thousands of photographs of Amtrak trains and related operations.

More than a decade ago I started collecting Amtrak system timetables and have a nearly complete set.

In fact the last printed Amtrak system timetable still sits on my desk. Dated Jan. 11, 2016, I refer to it often when looking up information for stories I’m writing about Amtrak.

My collection also includes some Amtrak memorabilia, including dining car menus, annual reports, and route guides.

My Amtrak photo collection may be vast, but not nearly as comprehensive as I wished that it was.

I wish I had photographed more or had the opportunity to photograph more widely during Amtrak’s first decade, which I still consider the most interesting one in its history.

Much of my collection of things Amtrak was prompted by my research for a book that was published by Indiana University Press in 2006 titled Amtrak in the Heartland.

I have had a keen interest in Amtrak since it began, probably because I’ve always had a passion for passenger trains.

In many ways, the company that calls itself America’s Railroad and I came of age at the same time and have grown older on parallel tracks.

I can’t remember a day when I wasn’t interested in Amtrak and can’t envision a time in which my interest in the history and current day affairs of the carrier will ever wane.

So, happy anniversary Amtrak; it’s been quite a ride we’ve had together.

Commentary by Craig Sanders

CSX, NS Seek Dismissal of Amtrak STB Case Over Gulf Coast Service

April 30, 2021

CSX and Norfolk Southern have asked the U.S. Surface Transportation Board to dismiss Amtrak’s petition asking regulators to force the two Class 1 railroads to allow operation of new Gulf Coast passenger service next year.

The host railroads said Amtrak’s complaint is not “ripe” because they have not refused Amtrak’s proposed service.

In a filing, the two railroads said they want Amtrak to live up to the commitments it made to complete a joint rail traffic controller modeling study to determine the infrastructure that will be required to support the service Amtrak wants to implement.

Amtrak has proposed operating two daily roundtrips between New Orleans and Mobile, Alabama.

The filing by NS and CSX also contends that Amtrak has not submitted an environmental and historic report with its STB petition, and that Congress did not give Amtrak any cause of action that could support its demand for an “interim order” allowing it to enter other railroads’ lines to perform preparations for new service before the STB decides whether the new service will be allowed.

Furthermore, the host railroads argued that Amtrak lacks important state support to ensure success of the proposed service.

At the center of the dispute is Amtrak’s withdrawing from a traffic study the host railroads contend must be completed before they will discuss what infrastructure improvements are needed to accommodate passenger service.

For its part, Amtrak contends the railroads hindered completion of the study by changing its parameters as it was being conducted.

The passenger carrier at the time it filed its request with the STB in February said it was seeking to force NS and CSX to demonstrate why they cannot host the proposed service.

In statement released after the host railroads asked the STB to dismiss the case, Amtrak said the matter is being considered by regulators and the intercity passenger carrier “fully anticipate the STB’s process will be both transparent and data driven. We will respond to all filings through that docket.”

At the time that Amtrak went to the STB, an Amtrak spokesman indicated that discussions about instituting the service have been ongoing for five years with no sign of a conclusion in sight.

Amtrak contends that federal law gives it a right of access to the host railroads for the proposed Mobile service.

In the past week, the STB case has also drawn the attention of various Alabama political officials.

Gov. Kay Ivey called for completion of the traffic study, which she said it critical for protecting the economic interests of the Port of Mobile.

Ivey said she wants the STB to order Amtrak to complete the traffic study before considering Amtrak’s application.

The governor’s statement to the STB also said, “Alabama has withheld funding for new Gulf Coast passenger service because of our concern that any economic benefit from new passenger rail service will be outweighed by the potential harm to freight rail service based on the current infrastructure. I am particularly concerned about the impact to the Port of Mobile. . .”

Mobile Port Authority CEO John C. Driscoll also has asked the STB to order Amtrak to complete the traffic study.

Port Officials have long expressed concern that passenger operations will adversely affect CSX freight service to the port.

Driscoll said in his statement that the port authority “does not oppose passenger rail into the City of Mobile, but we do have deep concerns regarding Amtrak’s impact on servicing current freight rail as well as servicing future freight capacity demand in the CSX corridor.”

Until August 2005 Amtrak served Mobile with its tri-weekly Sunset Limited, which operated along the Gulf Coast between New Orleans and Jacksonville, Florida.

Operation of Nos. 1 and 2 east of New Orleans was suspended after the route was damaged by Hurricane Katrina.

Amtrak Sends Congress its Wish List

April 30, 2021

Amtrak sent Congress its wish list this week for fiscal year 2022 funding and it is quite ambitious, seeking to nearly double what Amtrak received before 2020.

The requests include funding for new corridor services, hints at expanding the frequency of operation of the Cardinal and Sunset Limited, and seeks “bold” funding for Northeast Corridor and other capital projects.

The intercity passengers carrier wants a FY2022 grant of $3.88 billion for base needs and funding to offset the pandemic’s impacts on Amtrak and its state and commuter partners.

Also requested was $1.55 billion for Northeast Corridor infrastructure projects and development of new corridor routes across the nation.

In a statement, Amtrak CEO William Flynn noted that Amtrak will soon place into service new Acela equipment and locomotives for long distance trains.

Flynn said that granting Amtrak the funding it seeks would enable it to “play a central role” in helping the nation’s economy recover from the pandemic.

The funding requests are contained in a 77-page General and Legislative Annual Report and Fiscal Year 2022 Grant Request.

As reported earlier, Amtrak proposes to pick up all of the capital and operating costs for the first two years of operation of any new multi-frequency corridor.

But state and local governments would be expected to pay at least 10 percent of costs in the third year, 20 percent in the fourth, and 50 percent in the fifth.

In the sixth year state and local governments would be responsible for all costs as allocated uniformly under Section 209 of the Passenger Rail Investment and Improvement Act.

However, Amtrak believes that the corridor operations will earn enough revenue after five years to make continued operation attractive.

The funding for new corridor services could also be used to support increases in service frequency for less-than-daily long distance routes and certain specific investments in corridor service at no long-term cost to Amtrak’s state partners.

The latter could include service to Canada and Mexico. All of Amtrak’s service to Canada is currently suspended due to the COVID-19 pandemic.

The request mentions that Amtrak’s funding request also reflects funding needed to buy replacement equipment for Amtrak’s Superliner and Amfleet II fleet.

Amtrak earlier this month named Siemens to build 83 transets to replace Amfleet equipment but that is not thought to include Amfleet II cars.

Elsewhere on Amtrak’s wish list is federal legislation to give it a right to sue its host railroads for failure to provide dispatching preference for passenger trains and give the Surface Transportation Board authority to determine whether additional trains on a given route “would unreasonably impair freight transportation.”

The passenger carrier also reprised an idea from the 1980s that was never adopted of establishing an Intercity Passenger Rail Trust Fund.

If Amtrak gets its way, Railroad Rehabilitation and Improvement Program loans would be easier to obtain and states would be allowed to spend a portion of their Highway Trust Fund money on passenger rail.

Biden to Help Amtrak Celebrate 50 Years

April 29, 2021

President Joseph Biden will participate in a ceremony on Saturday to mark Amtrak’s 50th anniversary.

The White House said the event will be held at Philadelphia’s 30th Street Station where Biden also is expected to promote his $2.3 trillion infrastructure plan.

Biden became known as “Amtrak Joe” during his time as a senator when he commuted on Amtrak between Wilmington, Delaware, and Washington on a near-daily basis.

As vice president under Barack Obama Biden continued to sometimes ride Amtrak

Amtrak is expected to showcase some of its special livery locomotives during the Philadelphia event, including the Salute to Veterans ACS-46 and two P42DC locomotives that have received 50th-anniversary inspired liveries.

The latter includes the Midnight Blue No. 100 and No. 46, which has the current livery with a large 50th anniversary herald.

Other locomotives are slated to receive heritage and/or specially designed schemes, but those units have yet to be released for revenue service.

The Midnight Blue unit was released from the Beech Grove Shops near Indianapolis last weekend and was the trailing unit on Monday night’s Capitol Limited that departed Chicago en route to Washington.

In a related development, Amtrak said Thursday it is selling 50 percent off tickets to mark its anniversary.

The fares are available on select routes and come with a maximum fare of $50 per segment.

Reservations must be booked between April 28 and May 5 for travel between June 2 and Nov. 14.

More details and bookings can be done at Amtrak.com. Terms and conditions apply.

Track Work to Disrupt Downeasters

April 28, 2021

Track work being performed by Pan Am Railways will affect some Downeastern trains on April. 29.

Train 682 will terminate at Durham, New Hampshire. Non-stop alternate transportation will be provided between Durham and Boston North Station.

No alternate transportation will be provided to the missed stations of Exeter, Haverhill, and Woburn.

Train 685 will originate at Durham. Non-stop alternate transportation will be provided between Boston North and Durham but no alternate transportation will be provided to the missed stations of Woburn, Haverhill, and Exeter.

Trains 681, 683, 684 and 686 are cancelled with no alternate transportation being provided.

In a service advisory Amtrak said passengers on the affected trains may choose other Downeaster service or alternate dates of travel.

Track Work Affects Empire Corridor Trains

April 28, 2021

New schedules on Amtrak’s Empire Corridor have been implemented to accommodate track work being performed between Niagara Falls and Hoffmans, New York.

In a service advisory, Amtrak said the work affects the Maple Leaf and select Empire Service trains. The changes are in effect through Oct. 31.

Train 64 will depart Niagara Falls 10 minutes earlier at 12:07 p.m., with intermediate station adjustments, and arrives in Albany 21 minutes earlier at 6:18 p.m.

Train 284 will depart Niagara Falls 16 minutes earlier at 6:31 a.m., with intermediate station adjustments, and goes back to its regular schedule at Utica.

Train 281 will have intermediate station adjustments beginning at Syracuse at 3:55 p.m. and will arrive in Niagara Falls 15 minutes later at 7:26 p.m.

Train 283 will have intermediate station adjustments beginning at Syracuse at 6:49 p.m. and will arrive in Niagara Falls 15 minutes later, at 10:26 p.m.

Hiawatha Service being Restored May 23

April 28, 2021

Full restoration of Amtrak’s Hiawatha Service will be implemented on May 23.

There will be seven weekday round-trips between Chicago and Milwaukee with an additional Chicago departure on Friday nights.

The Saturday schedule will be seven departures from Milwaukee and six from Chicago. On Sunday there will be six round-trips.

Also being restored are two daily round-trip Amtrak Thruway buses between Green Bay and Milwaukee, with stops in De Pere, Appleton, Oshkosh and Fond du Lac, Wisconsin.

Amtrak said this service provides connections to and from Chicago using Hiawatha trains.

Reservations will continue to be required for travel on the Hiawathas and other pandemic safety measure remain in effect.

Amtrak said those with monthly or 10-ride passes must confirm their travel plans using Amtrak RideReserve on the company website or smartphone apps.

Cascades Service to Increase May 24

April 28, 2021

Additional Cascades Service roundtrips are set to begin service May 24.

Amtrak will restore three of four Seattle-Portland roundtrips and both Portland-Eugene roundtrips.

For more than a year the corridor has been limited to a single daily Seattle-Eugene roundtrip.

The trains will use a combination of Talgo Series 8 transets owned by the Oregon Department of Transportation and Amtrak owned Horizon equipment.

An additional full-corridor departure will leave Seattle at 7:25 a.m. and return from Eugene at 4:40 p.m., arriving at 11 p.m.

The new schedule has Train 507 departing Seattle at 6:10 p.m. and its equipment leaving Portland the next day at at noon.

The current schedule has a Talgo departing Seattle (No. 505) at 2:20 p.m. and leaving Eugene the next morning (No. 500) at 5:30 a.m. and arriving in Seattle at 11:50 a.m.

State transportation officials had wanted to shift the departure of No. 500 from Eugene to 8 a.m. but host railroads Union Pacific and BNSF would not allow it, Washington Department of Transportation Communications Manager Janet Matkin told Trains magazine.

Because the U.S.-Canadian border remains closed to non-essential travel, Cascades service between Seattle and Vancouver remains suspended.

At present, Amtrak operates a Thruway bus to Bellingham, Washington.

Washington state transportation officials said one Seattle-Vancouver roundtrip could be restored in July.

An official said Amtrak crews are qualified on the route and if the border opens sooner rail service could resume before July.

No date has yet been given as to when Amtrak will resume using the Point Defiance Bypass south of Tacoma.

Officials are eying late summer or early fall but said it is up to host railroad Sound Transit.

The public transit agency conducted testing on the route earlier this year and has been working through a crew qualification process.

Matkin said the Cascades will continue to operate at 50 percent capacity in compliance with Washington and Oregon’s ‘Ride Safe’ Initiatives.

Limited food and beverage service may begin at the same time or soon after the May 24 schedule expansion.

Canada Federal Budget Has Funds for VIA Corridor, Infrastructure Projects

April 28, 2021

Canada expects to budget $4.4 million for planning work on VIA Rail Canada’s proposed “high frequency rail” project.

The project seeks to create a passenger-only route for part of the Toronto-Quebec City corridor.

Also in the budget proposal is $491.2 million over six years, beginning in 2021-22, for VIA infrastructure projects that would support the high frequency rail project.

The budget document said $491.2 million would “help reduce bottlenecks, improve fluidity and connectivity, and allow VIA to take an important step toward high-frequency rail in the corridor.”

In an unrelated matter, VIA said that more stringent travel restrictions imposed last week in Ontario and Quebec are not expected to effect the railroad’s scheduled service.

“Passengers are responsible to comply with provincial restrictions,” VIA said in a statement.

Ontario’s new order prohibits non-essential travel into the province while Quebec has closed its borders to travelers from Ontario, where COVID-19 cases are on the rise.