Second Generation Turboliner

Back in the mid 1970s Amtrak tried to make a splash by leasing a couple of French-built gas turbine trains.

Capable of traveling 125 mph, Amtrak knew that the Turboliners would not be able to get close to that in the Chicago-St. Louis corridor where they were introduced in August 1973.

But the Turboliners were the newest equipment that Amtrak had to show off.

The first sets of Turboliners were built in France, but California-based Rohr Industries would build seven Turbotrain sets that were delivered between 1976 and 1977.

These Turboliners were based on the earlier French design but had American couplers and a re-designed cab car.

The Rohr or RTG Turboliners were capable of operating in electrified third rail territory so they were assigned to Empire Corridor Service in New York.

I was waiting for a commuter train in Beacon, New York, in December 1982 on what is now Metro North when one of the RTG Turboliners came charging past.

I had just enough time to get my camera  out and compose this image.

Tags: , , , , , , ,

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.


%d bloggers like this: