LSL Boston Through Cars to Resume in February

The Boston section of the Lake Shore Limited will not resume operating between Chicago and Boston until Feb. 1, 2016.

Currently, Nos. 448 and 449 are operating as a connecting train between Boston and Albany-Rensselaer, New York.

Amtrak said additional time is needed to complete a track reconfiguration and new platform construction at the station in Rensselaer. The project was originally scheduled to be completed in the fall.

Nos. 448 and 449 have been operating only between Boston and Albany-Rensselaer since early 2015.

The Viewliner sleepers previously assigned to the Boston section have instead been operating between Chicago and New York on Nos. 48 and 49, the parent train of the Lake Shore Limited.

In the interim, the Boston section has operated with coaches and a café car.

Advertisements

Tags: , , ,

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s


%d bloggers like this: